Weekend Bridge and Street Closures
The Willis Avenue Bridge will be fully closed to motorists and pedestrians on Saturday from 2 am to 6 am for swing span testing. Motorists may use the Madison Avenue Bridge at East 138th Street. Pedestrians and bicyclists may use the Third Avenue Bridge.
One tube of the Queens Midtown Tunnel will be closed from 1 am Saturday through 5 am Monday for necessary repair work. One lane will be open in each direction in the remaining tube. Trucks must use alternate route.